Birmingham City Centre
Birmingham City Centre
Historic documents relating to the Birmingham City Centre Extension Transport and Works Act can be viewed on this page. For latest information please visit the Midland Metro Alliance website.
Business Case
Business Case Main Document:
- Introduction
- Executive Summary
- Strategic Case
- Value for Money Case
- Delivery Commerical and Financial Case
Transport and Works Act Order Documents:
Midland Metro TWA Order 2010
- Midland Metro Order 2010
- Order Explanatory Memorandum
- Order Application
- Order Declaration as to Status of Applicant
- Order Consultation Report
- Order Statement of Aims
The Midland Metro (Birmingham City Centre Extension) TWA Order 2005
Final Order
BCCE TWA Order 2005
BCCE TWA Order Decision Letter
TWA Application Documents 2003-04
- Application
- Draft Order
- Explanatory Memorandum
- Declaration of Statement
- Funding Statement
- Estimate of Costs
- List of Consents
- Waiver Directions
- Rule 5 Affidavit
- Request for Planning Permission (Including Plans)
Listed Building Consent
- 1-13 Corporation Street
- 80 New Street
- 84 New Street
- 88-91 New Street
- 128 New Street
- Former Cinema-Ethel Street/Pinfold Street
- 45 Pinfold Street
- 47 Pinfold Street
- 1 Victoria Square
Consultation Report
- Consultation Exhibitions Times
- Consultation Feedback Forms
- Consultation Frequently Asked Questions and Answers
Work Plans
Land Plans
Traffic Regulation Order Plans
- Traffic Regulation Order Plan No.1
- Traffic Regulation Order Plan No.2
- Traffic Regulation Order Plan No.3
Environmental Statement
Volume 1: Main Statement
- 1. Introduction
- 2. Birmingham City Centre Extension Scheme
- 3. Approach to the Environmental Impact Assessment
- 4. Planning Policy
- 5. Land Use and Land Take
- 6. Long Term and Permanent Impacts
- 6.1 Long Term Use
- 6.2 Socio-Economic Impacts
- 6.3 Traffic and Transport Impacts
- 6.4 Noise and Vibration Impacts
- 6.5 Air Quality and Climate Change Impacts
- 6.6 Landscape and Visual Impacts
- 6.7 Archeological and Cultural Heritage Impacts
- 7. Short Term Construction Impacts
- 7.1 Introduction
- 7.2 Socio-Economic Impacts
- 7.3 Traffic and Transport Impacts
- 7.4 Noise and Vibration Impact
- 7.5 Air Quality and Dust Impacts
- 7.6 Landscape and Visual Impacts
- 7.7 Archaeological and Cultural Heritage Impacts
- 7.8 Impact on Water Resources
- 7.9 Contaminated Land
- 7.10 Non Hazardous Waste
Volume 2: Figures
- Appendix A: Information to be Included in Environmental Statements
- Appendix B: Bodies Consulted on the Scoping Report
- Appendix C: Consultation Material (see above)
- Appendix D: Draft Code of Construction Practice
- Appendix E: Details of Noise and Vibration Assessment Methodologies
- Appendix F: Urban Initiatives Drawings
- Edgbaston Terminus
- Five Ways
- Broad Street
- Broad Street/Brindley Place
- Centenary Square
- Town Hall
- Stephenson Street
- Corporation Street
- Bull Street
- St Chads
- Appendix G: Tree Survey
- Map 1
- Map 2
- Map 3
- Map 4
- Map 5
- Appendix 1
- Appendix 2 - Photos 1-4
- Appendix 2 - Photos 5-8
- Appendix H: Archeology and Cultural
Volume 3: Non Technical Summary